
Add to Cart
Galvanized Steel Floor Decking Roll Forming Lines Manufacturer
The steel floor deck roll forming machine is used to produce high-quality steel floor decks. The steel floor deck is also called floor bearing steel plate. This kind of floor deck is applied in supporting concrete or insulating membrane of a roof. It is developed to provide a structurally efficient product for use in roof and floor systems. The floor has the fllowing features: high peak and high strength with a low cost.
Specification
Suitable Material | ||
Material Width | 1000/1250mm | |
Effective Width | 600/850/915 mm | |
Material Thickness | 0.8-1.5mm | |
Material Type | Galvanized Steel Strip,Prepainted Galvanised Steel | |
Yeild Strength | 245Mpa | |
Main Machine | ||
Size shaft diameter | 95mm | |
Wall Panel Thickness | 18mm | |
Base Specification | H446*199 | |
Main Motor | 37KW hydraulic system | |
Forming Speed | 0-10m /min | |
Forming Station | 33 Stations | |
Blade Material | Cr12(Die Steel) | |
Roller Material | 45# steel,CNC lathes, Heat Treated,hard Chrome Coated | |
Mode of Speed Regulation | AC Inverter Speed Regulation | |
Driving Mode | Reduction Motor + Chain Transmission | |
Cutting Mode | Hydraulic Type,Post-cutting | |
Cutting Motor | Hydra station/hydraulic motor | |
Measuring Mode | Photoelectric Encoder | |
Control Mode | PLC | |
Operation Mode | Button+Touch Screen | |
Voltage | 380V or 415V/50Hz/3Ph or 220V/60Hz/3Ph | |
Dimension | 15 M*1.5M*1.3M | |
Machine Weight | 16500KG(15500KG) |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.