
Add to Cart
KOREA RO-D250 Roll Forming Machine For Metal Roof Panel Roofing Sheet
KOREA RO-D250 Roll Forming Machine For Metal Roof Panel Roofing Sheet are designed for high volume producers in the steel metal building industry,well build to your specific panel design from 20 to 30 gauge. Our lines are built to be flexible ,high speed and robust for tough production environments.Now this kind of machine have been exported to many countries, the most important is that ur need can be customized.
The main width of feeding coil material including: 914mm,1000,1219mm,1220mm and 1250mm. Then the effective width of roof tile is different.
Hydraulic motor roof panel roll forming machine. Power is from hydraulic motor. Hydraulic oil supply the power to roof panel roll forming machine
Part details | Item Name | Specification |
Manual uncoiler | carrying capacity | 5 tons |
Stype | Manual | |
Raw coil | Coil material | steel |
Coil thickness | 0.3-0.8 mm | |
Machine body | Roller station | 15-20 station |
Roller material | 45# steel | |
Shaft material | 45# steel | |
Shaft diameter | 75 mm | |
Machine weight | About 6.5 tons | |
Machine size | 6.5*1.5*1.5 m | |
Speed | 8-12 m/min | |
Cutter | Operate | Hydraulic cutting |
Blade material | Cr12 | |
Power | Operate | Chain transmission |
Chain size | 1 inch chain | |
Control system | PLC brand | Delta made in Taiwan |
Motor power | 7.5 kw | |
Hydraulic pump power | 4 kw | |
Voltage | 380V 50Hz 3phase | |
Machine color | As ur need | |
Machine language | Chinese and English |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.