
Add to Cart
Industry Solar Support Roll Forming Machine High Speed 25m/Min Fully Automatic
Industry Solar Support Roll Forming Machine High Speed 25m/Min Fully Automatic
Uncoiler Straightening→servo feeder→Hydraulic press breach device → Guide device → roll forming machine → hydraulic punch →shear device (including knife)→ finished product rack
Customization Various Size High Speed Solar Photovoltaic Panel Mounting Brackets Roll Forming Machine
This machine is widely used in solar structure,kinds of shelves,ceiling frames, drywall partition, steel structure building, ect.
Our machines are exported to many countries: Rwanda, Thailand, Philippines, Dubai, USA, South Africa, Peru, Russia, Saudi Arabia, Malaysia, Indonesia, etc.
specifications
item | value |
Type | Steel Frame & Purlin Machine |
Core Components | PLC, Engine, Bearing, Gearbox, Motor, Pressure vessel, Gear, Pump |
Material of forming rollers: | GCR15 steel, coated with chromed treatment |
Production Capacity | 15 m/min |
Material of cutter blade: | Cr 12 mould steel with quenched treatment 58-62℃ |
Voltage | 380V 50Hz 3phases or as your requirement |
Power | 22kw |
Dimension(L*W*H) | about 14.2*1.3*1.2m |
Weight | 9500kg |
Warranty | 1 Year |
Thickness of material | 2-3.5 mm |
Tolerance | +-1.5mm |
feeding width | 90-230mm |
Transmission method | By double chains |
Forming Speed | 8 m/min |
Hydraulic station power | 11 KW |
Quantity of rollers | 24 rollers |
Material Of machine body | 25mm 45# steel |
material | 45# forge steel |
2. Repairs will not be performed even during the guarantee period in the follow circumstances
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.Guarantee
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.