Add to Cart
PU Sandwich Shutter Door Roll Forming Machine Making Machine Manufactures Prices
Put the steel coil on the un-coiler----Feeding guide equipment----Roll-forming Machine----Foaming machine ----Adjusting device ----Punching device----Flying saw cutting-----finished products on stacker
This foaming aluminum shutter forming machine integrates cold roll forming technology and PU foaming technology into one, thuscontinuous automation production of foaming roller shutter door is achieved.
PU Sandwich Shutter Door Roll Forming Machine
1. Rolling up and down, the noise is smaller, the work is quieter, which means less damage to the door every day, longer working hours, and more suitable for human care in some crowded areas.
2. PU shutter doors and windows are sound absorbing materials, so once you shake the shutter door, most of the street sound will be absorbed by the foam in the shutter door.
3. Fireproof and energy saving: The foam density is large, which can save area energy and fire. Therefore, it is highly recommended to install the main door and window in a safer and more economical room.
Specification
Warranty of core components | 1 Year |
Voltage | 380V 50Hz |
Weight | 9000kg |
Production Capacity | 5-8m/min |
Power | 22Kw |
Dimension(L*W*H) | 20*1*1.2m |
Applicable Material | UPVC, Aluminum |
Production Capacity | 8-15M/Min |
Voltage | 380V.50HZ.3Phase |
Weight | 9000 kg |
Roll material | 45# high grade steel |
Cutting blade material | Cr 12 high grade steel |
Frame material | 300 H-high grade steel |
Core Components | Motor, PLC |
Roll stations | 18 rows |
Rolling thinckness | 0.3-0.8mm |
Dimension(L*W*H) | 20*1*12m |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.